hi human interface®
English

Getting Started

Getting Started

Overview

Use this section after a hi installation has been deployed and commissioned. It guides a new administrator or operator from first access to a verified routing action.

Installation, network setup, and initial commissioning are coordinated with the system integrator or Riedel Customer Success. Confirm the supplied server address, administrator credentials, and approved deployment information before starting.

Information

New to hi? Capitalized terms, including Node, Port, Source, Destination, Layer, and Topology, are defined in the Glossary.

Start Here

Begin with Interface Orientation. It explains the main interface regions and links to the login and interface references.

Guided Onboarding Path

  1. Interface Orientation - Sign in and identify the navigation, status, and workspace regions.

  2. Add Your First Device - Add a supported Node and verify it in the Node List and Topology View.

  3. Prepare a Control Panel Preset - Create a Take-mode Preset and filter its Source and Destination lists.

  4. Make Your First Route - Select a compatible Source and Destination, perform a Take, and verify the displayed connection.

If the installation already contains configured Nodes and a suitable Preset, continue to Make Your First Route.

Explore by Goal

Goal

Page

Sign in or understand authentication states

Login

Learn the complete menu and status model

Interface

Add
edit
or inspect Nodes

Nodes

Review or edit the Topology

Topology

Route signals and configure Presets

Control Panel

Plan client and server requirements

System Requirements

Diagnose an unexpected state

Troubleshooting

Next Steps

After completing the guided path, use Concepts to understand the system model or Operations to find a specific task.