Getting Started
Overview
Use this section after a hi installation has been deployed and commissioned. It guides a new administrator or operator from first access to a verified routing action.
Installation, network setup, and initial commissioning are coordinated with the system integrator or Riedel Customer Success. Confirm the supplied server address, administrator credentials, and approved deployment information before starting.
Information
New to hi? Capitalized terms, including Node, Port, Source, Destination, Layer, and Topology, are defined in the Glossary.
Start Here
Begin with Interface Orientation. It explains the main interface regions and links to the login and interface references.
Guided Onboarding Path
-
Interface Orientation - Sign in and identify the navigation, status, and workspace regions.
-
Add Your First Device - Add a supported Node and verify it in the Node List and Topology View.
-
Prepare a Control Panel Preset - Create a Take-mode Preset and filter its Source and Destination lists.
-
Make Your First Route - Select a compatible Source and Destination, perform a Take, and verify the displayed connection.
If the installation already contains configured Nodes and a suitable Preset, continue to Make Your First Route.
Explore by Goal
|
Goal |
Page |
|---|---|
|
Sign in or understand authentication states |
Login |
|
Learn the complete menu and status model |
Interface |
|
Add
|
Nodes |
|
Review or edit the Topology |
Topology |
|
Route signals and configure Presets |
Control Panel |
|
Plan client and server requirements |
System Requirements |
|
Diagnose an unexpected state |
Troubleshooting |
Next Steps
After completing the guided path, use Concepts to understand the system model or Operations to find a specific task.